January/2023 Latest Braindump2go 300-710 Exam Dumps with PDF and VCE Free Updated Today! Following are some new Updated 300-710 Real Exam Questions!
QUESTION 106
An organization is setting up two new Cisco FTD devices to replace their current firewalls and cannot have any network downtime. During the setup process, the synchronization between the two devices is failing.
What action is needed to resolve this issue?
A. Confirm that both devices have the same port-channel numbering
B. Confirm that both devices are running the same software version
C. Confirm that both devices are configured with the same types of interfaces
D. Confirm that both devices have the same flash memory sizes
Answer: D
Explanation:
The devices must have the same type and number of interfaces and software needs to be on same version.
However, the question is specifically touching on synchronization issues.
If you are using units with different flash memory sizes in your High Availability configuration, make sure the unit with the smaller flash memory has enough space to accommodate the software image files and the configuration files. If it does not, configuration synchronization from the unit with the larger flash memory to the unit with the smaller flash memory will fail.
https://www.cisco.com/c/en/us/td/docs/security/firepower/623/configuration/guide/fpmc-config-guide-v623/firepower_threat_defense_high_availability.html
Read More …